944 Race Car Project

The project, I am currently rebuilding my engine check out the pics.

Saturday, May 13, 2006

Head Install Part 2


The Eye of the Intake Valve....


Prepare for final torque of head to block. Torque Specs are: 1st: 25 ft lbs - 15 min pause - 2nd: 45 ft lbs -15 min pause - 3rd torque 65 ft lbs for stock studs. Some race shops find good results by using a final torque between 75-85 ft lbs. I used 70 ft lbs, since i am using ARP Race HEAD STUDS.

see this article and search for the keywords: head studs THEN READ
http://members.rennlist.com/tom86951/headgasket.htm

 Posted by Picasa

0 Comments:

Post a Comment

<< Home